A41/A4031 Junction Grade Separation, West Bromwich

Project Gallery

Project Information

CONTRACTOR: Balfour Beatty Civil Engineering
CLIENT: Sandwell Metropolitan District Council
STATUS: Complete

£14.3m scheme in West Bromwich to convert the junction between the A41 and A4031 into a grade separated interchange.

The scheme included construction of an underpass formed between secant pile walls, two road over-bridges and a footway bridge.

Precast concrete panels were used to clad the 630m of secant pile walls.

Products Supplied

Nearly 350 precast concrete panels were manufactured and installed by ABM in the scheme.