Chat with us, powered by LiveChat

Mercia Marina Canal Access, Derbyshire

Project Gallery

[gem_divider style=”2″ color=”#00b2a9″]
[gem_gallery gallery_gallery=”990″ gallery_type=”grid” gallery_style=”metro” gaps_size=”30″ metro_max_row_height=”380″]

Project Information

[gem_divider style=”2″ color=”#ffffff”]

CONTRACTOR: Tomlinson
CLIENT: Land & Water Group
CONSULTANT ENGINEER: Arcadis (Hyder Consulting)
STATUS:
 Complete

Development of Willington Lakes to form the Mercia Marina required the creation of a new connection canal to the nearby Trent and Mersey Canal. The road access to the site was raised over the new canal spur as it passes through a 17.5m long tunnel.

 

If you’d like to arrange training for your organisation about the features and benefits of our Arch and Portal Frame systems, please visit out Training page.

Products Supplied

[gem_divider style=”2″ color=”#00b2a9″]

Design, manufacture and installation of the precast arch system to provide a 17.5m long, 8.4m span, 4.8m high access tunnel using ABM’s 25/40 Arch System. The structure was supplied in 7, 2.5m long three part sections.