ABM’s Largest Portal Frame Bridge installed in Leeds

Erection of the twin span ABM Portal Frame structure at the Thorpe Park, Leeds

Erection of the twin span ABM Portal Frame structure at the Thorpe Park, Leeds

Installation of ABM’s largest ever twin span Portal Frame structure at the Thorpe Park Retail and Leisure Hub Development took place recently. The precast system which is over 34m wide and nearly 10m high will form a ‘Green Bridge’ at the heart of a pedestrian and cycle route through the development near Leeds.

ABM’s team of specialist installers assembled over sixty precision cast components weighing up to 60 tonnes each over five days.