200m ABM Arch Structure – Lubartów, Poland
200m ABM Arch Structure – Lubartów, Poland
Contractor: ABM Mosty
Sector: Infrastructure and civil engineering
Project Overview
A significant infrastructure milestone was achieved with the completion of a 200-metre-long ABM Arch structure in Lubartów, Poland. Delivered by ABM Mosty, this project showcased efficient engineering and project management, with the entire structure installed in just 14 days under the leadership of site manager Michał Borowiec.
Key Project Details:
• 200-metre-long ABM Arch structure
• Installation completed in 14 days
• Average progress of 14 metres constructed per day
• Delivered by ABM Mosty, Lubartów, Poland
The Client’s Challenge
Specific Problem:
The project required the rapid installation of a long-span arch structure to meet a tight programme. Achieving precision, minimising disruption, and ensuring long-term durability were all critical to project success.
Why Resolution Was Critical:
• Maintained overall project schedule and milestones
• Reduced the impact of construction on the local community and environment
• Delivered a robust, reliable structure for long-term infrastructure needs
Risks if Unresolved:
• Delays affecting wider project delivery
• Increased costs from extended site occupation
• Disruption to local stakeholders and infrastructure
Our Solution
ABM Mosty provided a full design and installation service for the ABM Arch structure, prioritising speed, quality, and safety:
• Designed a 200-metre ABM Arch system tailored to site and operational requirements
• Managed and delivered installation, achieving an average of 14 metres constructed per day
• Coordinated all site activities to ensure safety, precision, and efficiency
• Utilised the modular ABM Arch system for rapid assembly and minimal disruption
Technical and Logistical Innovations:
• Modular ABM Arch system, enabling scalable and efficient installation
• Advanced project planning and site management for maximum daily progress
• Expert leadership and coordination throughout the delivery phase
The Results
Outcomes for the Client:
• 200-metre ABM Arch structure completed on time and to specification
• Only 14 days required for full installation
• Minimal disruption to the surrounding area during works
• High-quality, durable infrastructure delivered efficiently
Quantifiable Results:
• 14 metres of arch structure installed per day on average
• Full 200-metre span achieved in a single installation phase
• Project milestone delivered within the planned schedule
Key Takeaways & Summary
The 200m ABM Arch Structure in Lubartów, Poland, demonstrates the efficiency, reliability, and technical excellence of the ABM Arch system and the ABM Mosty team. This project is a benchmark for rapid, high-quality infrastructure delivery in challenging timeframes.
Benefits Delivered:
• Fast-track installation minimising project duration and disruption
• Modular system adaptable to varied infrastructure needs
• Demonstrated expertise in large-scale arch design and installation
Unique Selling Points:
• Proven capability in delivering major arch infrastructure rapidly
• Advanced engineering and project management skills
• Commitment to quality and client satisfaction