200m ABM Arch Structure – Lubartów, Poland

200m ABM Arch Structure – Lubartów, Poland

Contractor: ABM Mosty

Sector: Infrastructure and civil engineering

Project Overview

A significant infrastructure milestone was achieved with the completion of a 200-metre-long ABM Arch structure in Lubartów, Poland. Delivered by ABM Mosty, this project showcased efficient engineering and project management, with the entire structure installed in just 14 days under the leadership of site manager Michał Borowiec.

Key Project Details:
200-metre-long ABM Arch structure
Installation completed in 14 days
Average progress of 14 metres constructed per day
Delivered by ABM Mosty, Lubartów, Poland

The Client’s Challenge

Specific Problem:
The project required the rapid installation of a long-span arch structure to meet a tight programme. Achieving precision, minimising disruption, and ensuring long-term durability were all critical to project success.

Why Resolution Was Critical:
Maintained overall project schedule and milestones
Reduced the impact of construction on the local community and environment
Delivered a robust, reliable structure for long-term infrastructure needs

Risks if Unresolved:
Delays affecting wider project delivery
Increased costs from extended site occupation
Disruption to local stakeholders and infrastructure

Our Solution

ABM Mosty provided a full design and installation service for the ABM Arch structure, prioritising speed, quality, and safety:

Designed a 200-metre ABM Arch system tailored to site and operational requirements
Managed and delivered installation, achieving an average of 14 metres constructed per day
Coordinated all site activities to ensure safety, precision, and efficiency
Utilised the modular ABM Arch system for rapid assembly and minimal disruption

Technical and Logistical Innovations:
Modular ABM Arch system, enabling scalable and efficient installation
Advanced project planning and site management for maximum daily progress
Expert leadership and coordination throughout the delivery phase

The Results

Outcomes for the Client:
200-metre ABM Arch structure completed on time and to specification
Only 14 days required for full installation
Minimal disruption to the surrounding area during works
High-quality, durable infrastructure delivered efficiently

Quantifiable Results:
14 metres of arch structure installed per day on average
Full 200-metre span achieved in a single installation phase
Project milestone delivered within the planned schedule

Key Takeaways & Summary

The 200m ABM Arch Structure in Lubartów, Poland, demonstrates the efficiency, reliability, and technical excellence of the ABM Arch system and the ABM Mosty team. This project is a benchmark for rapid, high-quality infrastructure delivery in challenging timeframes.

Benefits Delivered:
Fast-track installation minimising project duration and disruption
Modular system adaptable to varied infrastructure needs
Demonstrated expertise in large-scale arch design and installation

Unique Selling Points:
Proven capability in delivering major arch infrastructure rapidly
Advanced engineering and project management skills
Commitment to quality and client satisfaction