Bayford Wharf Footbridge, Lincoln – Delivering Precast Piers for Network Rail

Bayford Wharf Footbridge, Lincoln – Delivering Precast Piers for Network Rail

Client Introduction

Client: Network Rail
Contractor: Morgan Sindall Construction & Infrastructure Ltd
Sector: Rail infrastructure and civil engineering

Project Overview

The Bayford Wharf Footbridge project forms part of Network Rail’s Railway Upgrade Plan for Lincoln, with the objective of improving safety and accessibility at Brayford Wharf level crossing. The project involved installing a stepped footbridge, providing uninterrupted, 24/7 access over the railway for both pedestrians and cyclists.

Key Deliverables:

  • 2 precast piers (4.9m x 2.1m, 40.6 tonnes each)
  • 26 bespoke precast cladding panels

The Client’s Challenge

Specific Problem:
Network Rail required high-performance precast piers to support a complex bridge span, all within a highly constrained site adjacent to the River Witham and a busy city road. Strict Network Rail standards for headroom and maintenance, as well as extensive underground services, added further complexity.

Criticality:

  • Ensured uninterrupted, safe public access across the railway
  • Minimized disruption to local traffic and residents
  • Delivered a durable, low-maintenance solution in line with Network Rail’s long-term requirements

Risks if Unresolved:

  • Prolonged road closures and public inconvenience
  • Safety concerns at the crossing
  • Delays to a high-profile infrastructure upgrade

Our Solution

ABM Precast Solutions provided a tailored, engineered approach:

  • Designed and manufactured two monolithic precast piers, precisely dimensioned to support the steel bridge span while minimising their footprint on the pedestrian pathway
  • Produced 26 custom cladding panels to achieve the architectural vision and ensure durability
  • Collaborated closely with Morgan Sindall and the design team to coordinate delivery and installation within the site’s constraints
  • Utilised off-site manufacturing to ensure quality, accelerate installation, and reduce disruption

Technical and Logistical Innovations:

  • Heavy-duty precast piers designed for rapid installation and long-term performance
  • Bespoke formwork and reinforcement to accommodate unique tapering geometry
  • Just-in-time delivery scheduling to suit restricted access and minimise on-site storage

The Results

Outcomes for the Client:

  • On-time installation of all precast piers and cladding panels
  • Enhanced public safety and continuous access across the railway
  • A visually striking, low-maintenance landmark for Lincoln

Quantifiable Results:

  • Two precast piers (each 4.9m x 2.1m, 40.6 tonnes) installed with zero defects
  • 26 cladding panels fitted to exacting architectural standards
  • Project completed within the planned closure period

Key Takeaways & Summary

The Bayford Wharf Footbridge project demonstrates ABM Precast Solutions’ expertise in delivering precast piers for complex rail infrastructure. Our collaborative, precision-engineered approach ensured compliance, safety, and efficiency, providing long-term value to Network Rail and the Lincoln community.

Benefits Delivered:

  • Reliable, high-performance precast piers tailored for challenging site conditions
  • Seamless integration with architectural and structural requirements
  • Efficient project delivery with minimal disruption

Unique Selling Points:

  • Proven capability in delivering precast piers for rail projects
  • Technical excellence and commitment to client satisfaction