Powick Common Viaduct – W5 Beams for the Worcester Southern Relief Road

Powick Common Viaduct – W5 Beams for the Worcester Southern Relief Road

Client: Worcestershire County Council
Contractor: Alun Griffiths
Sector: Civil engineering and infrastructure

Project Overview

The Powick Common Viaduct is a critical component of the Worcester Southern Relief Road upgrade, supporting the transformation of the A4440 into a dual carriageway. Our expertise in precast solutions was central to this project, with the supply of 20.5m and 16.5m W5 Beams, Deck Edge Parapets, and deck slabs. These components were engineered to meet the demands of a high-traffic route and ensure long-term durability.

Key Project Details:
20.5m and 16.5m W5 Beams supplied for the viaduct span
Deck Edge Parapets and deck slabs provided for structural and safety performance
Integral to the dualling of the A4440 Southern Link Road, a vital bypass and river crossing for Worcester

The Client’s Challenge

Specific Problem:
The A4440 Southern Link Road is a strategic route connecting the M5 to West and South Worcester, Great Malvern, and beyond. Prior to dualling, it suffered from severe congestion, especially at peak times. The Powick Common Viaduct required high-specification beams and components capable of supporting increased traffic volumes and ensuring safety for years to come.

Why Resolution Was Critical:
Eased congestion and improved journey times for thousands of road users
Enhanced connectivity between key regional destinations
Provided a robust, future-proofed structure as part of one of Worcester’s only two river crossings

Risks if Unresolved:
Continued congestion and delays
Reduced economic growth and accessibility in the region
Increased maintenance costs and potential safety issues

Solution

Our team delivered a tailored precast solution for the Powick Common Viaduct, focusing on quality, precision, and efficiency:

Supplied 20.5m and 16.5m W5 Beams, engineered for optimal strength and performance
Manufactured and delivered Deck Edge Parapets for enhanced safety and aesthetics
Provided deck slabs, ensuring a durable and reliable carriageway surface
Coordinated closely with Alun Griffiths to ensure seamless installation and minimal disruption to the busy route
Employed rigorous quality control and just-in-time delivery to meet the project’s demanding schedule

Technical and Logistical Innovations:
Precision-engineered W5 Beams for efficient installation and long-span support
Modular component design to facilitate rapid site assembly
Advanced logistics planning to suit the live, high-traffic construction environment

The Results

Outcomes for the Client:
Successful installation of all W5 Beams, Deck Edge Parapets, and deck slabs
On-schedule project delivery, supporting the accelerated dualling programme
Significantly improved traffic flow and reduced congestion on the A4440

Quantifiable Results:
20.5m and 16.5m W5 Beams installed to exacting specifications
All precast elements delivered and fitted within the construction window
Enhanced safety and durability for one of Worcester’s key transport links

Key Takeaways & Summary

The Powick Common Viaduct project demonstrates our expertise in delivering complex, large-scale precast solutions for major transport infrastructure. The use of “Powick Common Viaduct W5 Beams” and associated components has played a pivotal role in strengthening Worcester’s strategic road network and supporting regional growth.

Benefits Delivered:
High-performance W5 Beams and deck components tailored for a busy, high-specification viaduct
Efficient, on-time delivery and installation
Enhanced safety, durability, and connectivity for the region

Unique Selling Points:
Proven track record in major viaduct and bridge projects
Technical excellence in W5 Beam design and manufacture
Commitment to supporting strategic infrastructure upgrades