Precast Pile Cap – Tees Transporter Bridge Lift



Who is the client?
Balfour Beatty Civil Engineering
Project Overview
The Tees Transporter Bridge is a historic and iconic structure in Middlesbrough, serving as a vital crossing and a symbol of the region’s industrial heritage. As part of ongoing upgrades and essential maintenance, Balfour Beatty Civil Engineering undertook the installation of a new pile cap to support the bridge lift system, ensuring the continued safe operation and longevity of this landmark.
Units Supplied
Precast pile cap measuring 4480 x 3200 x 1300 mm
The Client Challenge
Upgrading the Tees Transporter Bridge demanded a robust and precisely engineered solution that could be installed quickly and safely, minimising disruption to both the structure and the surrounding area. The pile cap needed to deliver exceptional strength and durability, meeting strict quality and dimensional requirements.
The Solution
ABM Precast Solutions worked closely with Balfour Beatty Civil Engineering to design and manufacture a bespoke precast pile cap. Offsite production allowed for rigorous quality control and a rapid turnaround, while the finished unit was delivered to site ready for immediate installation, reducing onsite labour, programme risk, and potential delays.
The Results
The new precast pile cap provides a solid, reliable foundation for the bridge lift mechanism, supporting the long-term function and safety of the Tees Transporter Bridge. Installation was completed efficiently, with minimal disruption to local infrastructure and operations.
Key Takeaways
• Precast pile caps deliver strength, precision, and rapid installation for critical infrastructure projects
• Offsite manufacturing ensures quality and minimises onsite risk
• Collaboration with contractors enables bespoke solutions for challenging engineering requirements