Renault F1 CFD Centre, Oxfordshire
Construction of buried work space to provide a design development and exhibition space with minimal landscape impact. The unique building is used by the Formula 1 racing team for computational aerodynamic research and houses an auditorium and extensive computer server room.
If you’d like to arrange training for your organisation about the features and benefits of our Arch and Portal Frame systems, please visit out Training page.
Products Supplied
- Design, manufacture and installation of the precast arch system to provide the 60m long, 16.3m span, 6.5m high building using ABM’s 64/225 Arch system. The structure was supplied in 24, 2.5m long three part sections.
Contractor
SDC Construction Group
Designer
URS Infrastructure & Environmental UK Ltd
Client
Renault F1 Team