Latest News

#
02 Mar: Manhattan Gate Bridge – 82 Tonne Precast Pier Units

ABM Precast Solutions recently delivered the first precast components for the new Manhattan Gate Bridge in Middlesbrough. The two 82 tonne precast central pier units were successfully installed on to tubular steel pile foundations in the entrance to the Middlehaven Dock next to the town’s the Riverside Stadium by main contractor, Balfour Beatty. Read more  

#
10 Nov: Prestressed Beam Selector App…..

BRIDGE BEAM SELECTION JUST GOT A WHOLE LOT QUICKER AND EASIER WITH ABM’S NEW MOBILE APP The app is available from the Google Play Store for Android and the Apple Store for iphones/ipads by searching ABM Precast. Intuitive to use, the app guides you through the selection process in six questions to provide an instant recommendation of concrete bridge beam

#
10 Nov: ABM Culverts on site

The latest output from ABM’s extended culvert production facility was recently installed on the A45 Daventry Development Northern Link Road. The 38.0m long 3.0m x 2.0m culvert will sit below a 5.5m x 5.5m Portal Frame access underpass beneath the new carriageway. The culvert was supplied in 2.0m long sections with an integral headwall/upstand on the end units. For many

#
02 Dec: What an uplift!

Our new Straddle Carrier has just gone in to use. The remote controlled equipment is being used to lift and transport precast units weighing up to 35 tonnes and will greatly improve the efficiency of our storage and loading areas. The Combilift SC30 was custom built to match ABM’s varied product range and optimise the use of storage space.

#
23 Nov: AVAILABLE NOW…..ABM’s new PRESTRESSED BRIDGE BEAM DATA BOOK

Our new Prestressed Beam Data Book is now available to download. The 28 page booklet gives comprehensive details of our range of 14 different Prestressed beam types along with information about a wide range of ancillary components to complement the beam range and notes on Prestressed beam design. You can view or download the new book directly from our website