Latest News

#
23 Nov: AVAILABLE NOW…..ABM’s new PRESTRESSED BRIDGE BEAM DATA BOOK

Our new Prestressed Beam Data Book is now available to download. The 28 page booklet gives comprehensive details of our range of 14 different Prestressed beam types along with information about a wide range of ancillary components to complement the beam range and notes on Prestressed beam design. You can view or download the new book directly from our website

#
08 Nov: Another replacement rail bridge ready to go…..

Trial erection of this 540 tonnes structure which will provide increased clearances over a twin track railway has just been completed at ABM’s Tuxford production facility prior to delivery to site. The complex , heavily skewed structure combines pre-stressed, reinforced and masonry composite concrete elements and incorporates embedded ducts to allow rapid reconnection of utility services. Note the ‘Brick Sandwich’

#
10 Oct: ABM Expands Again

Production has recently started in a further extension to ABM’s precast concrete manufacturing facility at Tuxford, North Nottinghamshire. The additional 1,200m² facility is equipped with 30 tonne lifting capacity and adds to ABM’s established reinforced precast concrete production capacity.

#
08 Sep: Scotswood

A shot of our bespoke precast concrete plinths being installed at a housing development in Newcastle-upon-Tyne. The contractor required these on site as soon as possible, we pulled out all the stops to get these designed, manufactured and delivered in a very narrow time frame…resulting in another very happy client!

#
12 Aug: Another one ready to go!

Trial erection of a rail underbridge at ABM’s Nottinghamshire plant. The 173 tonnes of precast concrete will shortly be transported to site for final assembly before a ‘Drive In’ installation using a Self-Propelled Modular Transporter (SMPT) during a weekend rail closure by contractor AMCO Rail. The 8.6m span deck assembly is made up of 2 Impost units, 2 Reinforced concrete