A41/A4031 Junction Grade Separation, West Bromwich

£14.3m scheme in West Bromwich to convert the junction between the A41 and A4031 into a grade separated interchange.

The scheme included construction of an underpass formed between secant pile walls, two road over-bridges and a footway bridge.

Precast concrete panels were used to clad the 630m of secant pile walls.

Products Supplied

  • 350 precast concrete panels were manufactured and installed by ABM in the scheme

Contractor

Balfour Beatty Construction Services (UK)

Designer

Scott Wilson

Client

Sandwell Metropolitan Borough Council