A41/A4031 Junction Grade Separation, West Bromwich
£14.3m scheme in West Bromwich to convert the junction between the A41 and A4031 into a grade separated interchange.
The scheme included construction of an underpass formed between secant pile walls, two road over-bridges and a footway bridge.
Precast concrete panels were used to clad the 630m of secant pile walls.
Products Supplied
- 350 precast concrete panels were manufactured and installed by ABM in the scheme
Contractor
Balfour Beatty Construction Services (UK)
Designer
Scott Wilson
Client
Sandwell Metropolitan Borough Council